Halvdagsåa in Selbu
Halvdagsåa power plant is located in Selbu Municipality in Trøndelag. By utilizing a drop of 200 meters the power plant has an annual production of 2.4 GWh. The power plant has been in operation since 2014.
effect
income 0 NOK
volume 0 MWH
*Total production for plant
**Real time indicatiors might be delayed in some circumstances
The authorities (the Norwegian Water Resources and Energy Directorate) have set a minimum water flow in the summer and during the winter to preserve the environment and landscape.
Gross head (m) 200
Length of pipeline (m) 1200
Power (MW) 0.8
Production (GWh/year) 2.4
Minimum water flow (l/s) 9
Vakttelefon
907 09 365
Stasjonsleder
Håkon Kindsbækken
hakon.kindsbaekken@clemenskraft.no
483 61 314