Bjåstad power plant, which is located in the Fjærlandsfjord in Sogndal Municipality in Vestland, utilizes a drop of 383 meters for an annual production of 16.3 GWh. The power plant has been in operation since 2018.
effect
income 4 055 985 NOK
volume 12 594 MWH
*Total production for plant
**Real time indicatiors might be delayed in some circumstances
The authorities (the Norwegian Water Resources and Energy Directorate) have set a minimum water flow in the summer and during the winter to preserve the environment and landscape.
Gross head (m) 383.6
Length of pipeline (m) 1130
Power (MW) 5.19
Production (GWh/year) 15.9
Minimum water flow summer (l/s) 250
Minimum water flow in winter (l/s) 50