Hellifossen in Bindal
Hellifossen power plant is located in Bindal Municipality in Nordland. The power plant will utilize a drop of 125 meters and will have an annual production of 27.7 GWh which will provide around 1400 households with electricity. The power plant has been in operation since 2021.
effect
income 3 898 368 NOK
volume 14 214 MWH
*Total production for plant
**Real time indicatiors might be delayed in some circumstances
Landowner's statement
We considered both development under our auspices and other development companies before we chose Clemens kraft. This was primarily due to good references, good terms, and orderly contract negotiations. We are now halfway through the construction project and are very satisfied, both with the company’s professionalism and not least with the environmental considerations taken into account in the watercourse. -Frithjof M. Plahte
Gross head (m) 125
Length of pipeline (m) 1700
Power (MW) 8.5
Production (GWh/year) 27.7
Minimum water flow summer (l/s) 480
Minimum water flow in winter (l/s) 200
Vakttelefon
907 09 365
Stasjonsleder
Joachim Hines
joachim.hines@clemenskraft.no
990 39 494